ACE Product Timeline

2014

SUTRAK delivers 370 electric systems to North American Bus Industries for Dallas Area Rapid Transit buses.

2011

Deliver pilot vehicle for rear mounted CNG system. (First of up to 740 units). Deliver for 42-foot BRT project

2010

Deliver electric systems on hybrid electric articulated buses with SUTRAK power generation

2009

Deliver for hybrid electric turbine bus

2008

Deliver electric systems on 40-foot Allison hybrid buses with SUTRAK power generation

2007

Deliver electric systems on 40-foot diesel buses with SUTRAK power generation

2006

Deliver electric systems on articulated diesel buses with SUTRAK power generation. “ACE” branded for all electric systems

2005

SUTRAK power generation system demonstrated at APTA Dallas, Texas

2004

Develop and deploy roof mount (Stacked) on Fuel Cell buses

2003

Develop and deploy rear mount ACE system on hybrid electric systems with ISE

2002

SUTRAK unveils all-electric self-contained systems at the APTA Expo in Las Vegas, Nevada

1998

Initial designs for electric HVAC systems begins